ٹینڈر انکوائری# اختتامی تاریخ اور وقت
 CPTM-115/03/2019  18, Apr 2019 11:00 AM 
آئٹم تفصیلات مقدار
 Supply of Material & Civil Construction of Approach Pathway at Sub Ordinate Quarter at AC-4, Uch Shareef Following civil construction are required • Total area to be tuff tiles is 3000 sft.(approx.) along with allied material and labor required for construction of pathway • Brick ballast 4" dully compacted • Sand cushioning of 1 inch dully compacted • Existing level of road / surface is strictly maintained • Soil removal if necessary. • Laying of tuff tiles 60mm thick 7000 PSI compressive strength which includes sand grouting. • The contractor will submit / arrange testing certificate of the tuff tiles from standard institute to show that the material being provided comply with specifications.  --