Segment-Wise Transmission Break-up

Segment Wise Transmission System Capacity From July - December 2018

Transmisison Network Segment Planned /Designed Flow Capacity (MMCFD) Available Capacity (MMCFD) Max. Flow passed (MMCFD) % age of (1) Capacity Utilization Un-contracted Capacity (MMCFD)
Sui- Bhong (2) 790 400 299 75 101
Sawan- Qadirpur 1510 1510 1045 69 465
Qadirpur- Bhong 1860 1860 1244 67 616
Bhong -AC4 (5) 2170 2070 1513 73 557
AC4 - AV22 (5) 2100 2000 1482 74 518
AV22 - Kot Addu 400 400 305 76 95
Dhodak - Kot Addu 70 70 11 16 59
AV22 - Multan (5) 1900 1800 1295 72 505
Multan - AV29 1750 1750 1292 74 458
AV29 - Sahiwal - Lahore 950 950 675 71 275
AV29 - Faisalabad 990 770 4 672 87 98
Faisalabad -Lahore 500 500 303 61 197
Faisalabad -Galli Jagir 350 350 90 26 260
Wah - Nowshera 110 110 187 170 Nil
Wah - Abbottabad 94 94 79 84 15
Gurguri - Kohat - Ismailkot 315 315 319 101 Nil
FC1 (Dhullian) - C6 (Galli Jagir) 314 314 102 32 212
Nowshera - Mardan 75 75 87 116 Nil
Mardan - Mangora 30 30 40 133 Nil
    1. Percentage of capacity utilization is computed w.r.t available capacity.
    2. Capacities of this segment is dependent on gas delivery pressure from sources.
    The available capacity of this segment has reduced due to reduction of gas delivery pressure from Sui gas field on account of its depleting trend.
    3. With start / increase in gas supply from MOL's CPF, gas is flowing in reverse direction from Ismailkot / Norwshera towards Wah.
    4.Capacity of the segment reduced due to relocation of compressor units from AC-7 compressor station.
    5.Available capacity of Bhong - AC4, AC4 - AV22, & AV22 - Multan are less than design capacities of these segment due to isolation / operation of 18" dia pipeline at low pressures on account of inegrity of this pipeline.

Updated: 17-07-2018