Province-Wise Transmission Breakup

Province-Wise Breakup Transmission System as on 30-09-2020

Sr #. Section Dia Meter in Inches MainLine (KM) LoopLine (KM)
1 PIRKOH - SUI 24 70.50 -
2 LOTI - PESHBOGI 18 11.25 -
3 SUI - MULTAN 24 19.31 -
4 SUI - MULTAN 30 - 19.31
SUB TOTAL BALOCHISTAN 101.06 19.31
Sr #. Section Dia Meter in Inches MainLine (KM) LoopLine (KM)
1SUI-MULTAN2414.29-
2SUI-MULTAN30-14.29
3SUI-MULTAN160.26-
4GUDDU TPS42.41-
5GUDDU BARRAGE241.81-
6GUDDU CROSSING36-1.81
7SAWAN - QADIRPUR24131.00-
8SAWAN CUSTODY TRANSFER POINT-SV1242.85-
9SAWAN CUSTODY TRANSFER POINT- U/S OF SV142-2.73
10SV1-SV2 LINE42-25.12
11SV2 - SV4 SEGMENT42-55.33
12SV4-SV542-20.92
13SV5-QV1 SEGMENT42-29.40
14KAND KOT LINE1652.23-
15QADIRPUR LINE3053.13-
16QADIRPUR LINE36-53.14
17QADIRPUR LINE (LNG PHASE-II)42-53.14
18ENGRO FERTILIZER LINE 2037.80-
19ENGRO ENERGY LINE 163.30-
20MARI DCPF - GENCO-II DEHYDRATION UNIT LINE124.50-
21MARI DCPF - GENCO-II DEHYDRATION UNIT LINE105.50-
SUB TOTAL SINDH309.08255.88
""
Sr #. Section Dia Meter in Inches MainLine (KM) LoopLine (KM)
1SUI - MULTAN18-256.82
2SUI - MULTAN24288.06-
3SUI - MULTAN30-313.78
4SUI - MULTAN36-213.68
5SUI - MULTAN161.85-
6K1 – MP-37.8820-20.68
7SHER SHAH X-ING 36-2.20
8AC1X – AV7 (RYK)36-26.96
9AC1X - AC2 (RLNG LINE)36-44.62
10AC2 - AV9 (RLNG LINE)36-18.52
11AV9 - AV10 (RLNG LINE)36-20.78
12AV10 - A4 (RLNG LINE)36-30.1
13A4 - AC4 (RLNG LINE)36-29.51
14AC4-AV15 (RLNG LINE)36-25.348
15AV15 - AV-20 (RLNG LINE)36-5.74
16AV20 - AV 21 (RLNG LINE)36-38.09
17AV21 - AV 22 (RLNG LINE)36-27.79
18AV22 - AC6 (RLNG LINE)36-27.35
19AC6 - AV29 (RLNG LINE)36-23.16
20AV29 - N2 (RLNG LINE)24-68.16
21N2 - SAHIWAL (RLNG LINE) 24-77.296
22SAHIWAL - OKARA CANTT. (RLNG LINE)30-24.25
23OKARA CANTT. - AKHTARABAD (RLNG LINE)30-42.45
24AKHTARABAD - PHOOLNAGAR (RLNG LINE)30-42.64
25AV17 - AV 2036-3.50
26AV21 – AV 2236-27.79
27SUTLEJ CROSSING - 1121.613.22
28SUTLEJ CROSSING - 236-2.04
29KHANPUR LINE622.81-
30A5 - BAHAWALPUR848.18-
31AV22 - KOT ADDU1669.65-
32AV22 - KOT ADDU20-38.01
33MP 37.33 V/A - CMS KAPCO16-8.7
34 KOT ADDU - CHOWK SARWAR SHAHEED826-
35D. G. KHAN LINE872.06-
36DHODAK - KOT ADDU1677.79-
37TPS MUZAFFARGARH LINE164.57-
38QADIRPUR - AC-1X LINE3017.11-
39QADIRPUR - AC-1X LINE36-16.88
40QADIRPUR - AC-1X LINE (LNG PHASE-II)42-17.13
41AHMEDPUR EAST618.34-
42KHAN GARH822.20-
43MULTAN - FERTILIZER LINE101.430-
44JAHANIAN LINE830.49-
45MULTAN - SIDHNAI18-46.70
46MULTAN - SIDHNAI2422.4622.46
47MULTAN - SIDHNAI30-46.70
48MULTAN - SIDHNAI36-48.38
49AV29 - SAHIWAL36-145.46
50A8-Ex AC7 (PUNJAB POWER PLANT LINE)24-54
51Ex AC7 - END POINT (PUNJAB POWER PLANT LINE)24-39
52KASHMORE-SHAHWALI LINE1220-
53SHAHWALI-ROJHAN LINE (FIRST SEGMENT)124.0-
54SHAHWALI-ROJHAN LINE (MP 14.92 TO MP 27.792)1221.0-
55HAROONABAD LINE820-
56SMS KHANGARH - KALLARWALI830-
57SMS KALLARWALI - CHOWK PERMIT827.61-
58SIDHNAI - FAISALABAD18-163.58
59SIDHNAI - FAISALABAD24-50.24
60SIDHNAI - FAISALABAD30-53.29
61SIDHNAI - FAISALABAD36-26.42
62SIDHNAI X-ING - AC-736-33.26
63AC7 - HAVELI BAHADUR SHAH3037.30-
64DARKHANA-SINDHELIANWALI LINE817.40-
65T.T. SING - JHANG830.28-
66DIJKOT-SAMUNDARY LINE822.33-
67SAHIWAL - LAHORE18142.93-
68SAHIWAL - AKHTARABAD24-66.69
69SUNDER INDUSTRIAL STATE LINE164.34-
70AC8 - SMSII (OLD)16-5.90
71AC8 - A1120-0.66
72WAPDA OFFTAKE FSD122.42-
73CHAK JHUMRA LINE612.04-
74FSD - MALIKWAL1219.34-
75FSD - MALIKWAL16-158.67
76FSD - MALIKWAL30-90.82
77CV12A - KHATHIALA SHAKHAN LINE1228.23-
78KATHIALA SHEIKHAN - MANDI BAHAUDDIN LINE129.1-
79MANDI BAHAUDDIN - LALAMUSA LINE1247.17-
80MALAKWAL - JHELUM CROSSING16-5.42
81CHENAB CROSSING CHINIOT181.13-
82CHENAB CROSSING CHINIOT302.32-
83KOT MOMIN - JOHARABAD (1)872.41-
84KOT MOMIN - JOHARABAD (2)638.36-
85JOHARABAD - CHASHMA882.21-
86PIPLAN LINE817.05-
87SARGODHA LINE620.92-
88SARGODHA LINE16-20.92
89CV3 (JHOKE MORE)-M3 INDUSTRIAL ESTATE LINE815.68-
90FSD - SHAHDARA1657.48119.25
91NEW BV3 - MP 28.33 (RLNG LINE)16-25.1
92FSD - SHAHDARA24-55.03
93BC1 - FAROOQ ABAD822.96-
94SHAHDARA - LAHORE162.512.99
95RAVI CROSSING (1)160.58-
96RAVI CROSSING (2)10-0.58
97SHAHDARA - WAPDA LAHORE103.41-
98KHURRIANWALA - JARANWALA8-22.53
99DAWOOD HERCULES LINE125.87-
100SHEIKHUPURA - GUJRANWALA (1)1059.44-
101SHEIKHUPURA - GUJRANWALA (2)16-44.57
102MP 59.91 - B3 LINE24-22.83
103MP 59.91- TATLAYALI V/A (RLNG LINE)16-44.57
104MP 59.91- BHIKHI POWER PLANT (QATPL)30-16.17
105MP 59.91 - QUAID-E-AZAM APPAREL PARK1617.00-
106B2 - MP 50.70 (QATPL LINE)301.45
107MP 59.91 - NANDIPUR POWER PLANT 2476.4-
108TATLAYALI V/A - MP 27.186 ON NANDIPUR POWER PLANT PIPELINE248.20-
109B3-RAVI D/S LINE243.15
110KOTLI - RAHWALI (BV13)1830.76
111HAFIZABAD LINE843.00-
112SHAHDARA - GUJRANWALA - RAHWALI1073.4-
113RAHWALI - GUJRAT835.46-
114RAHWALI - SIALKOT813.9713.97
115SIALKOT OFF-TAKE V/A TO PASROOR OFF-TAKE V/A16-32.83
116RAHWALI-SIALKOT OFFTAKE18-1.48
117PASROOR - DHAMTAL - NAROWAL 840.55-
118SIALKOT O/T - WAZIRABAD18-19.82
119SAHIWAL - LAHORE16-76.67
120BSL U/S - BALLOKI POWER PLANT307.5-
121PHOOL NAGAR - U/S HEAD BALLOKI18-10.38
122D/S HEAD BALLOKI TO MP-59.918-52.34
123PHOOL NAGAR - DAWOOD HERCULES1662.38
124PHOOLNAGAR - DAWOOD HERCULES24-65.47
125U/S V/A HEAD BALLOKI TO D/S V/A HEAD BALLOKI (RLNG LINE)24-3.10
126ORIENT POWER PLANT LINE101.88-
127SAPPHIRE POWER PLANT LINE100.22-
128HALMORE POWER LINE123.4-
129SAIF POWER PLANT SAHIWAL120.34-
130GUJRAT - JHELUM854.27-
131SARAI ALAMGIR - MIRPUR818.5-
132RENALA-SATGARAH812.35-
133MALIKWAL - HARANPUR - DANDOT121.18-
134MALIKWAL - HARANPUR - DANDOT16-20.00
135CC1 - C430-29.09
136C4 - CHAKWAL CEMENT1024-
137HARANPUR - GHARIBWAL813.02-
138DANDOT - GALI JAGIR - WAH 1087.7-
139DANDOT - GALI JAGIR - WAH 16-153.51
140DANDOT - GALI JAGIR - WAH 30-64.22
141DAKHNI - MEYAL - DHULIAN1650.44
142CV13a - CC116-3.58
143RATANA LINE102.49-
144SIL CROSSING10-1.46
145DHURNAL LINE (1)80.54-
146DHURNAL LINE (2)1011.08-
147DHULIAN - DAUDKHEL885.24.04
148FC1-MP 13.2024-21.25
149FC1-C6 PIPELINE FROM MID POINT VALVE ASSEBMLY TO END POINT C6 GALI JAGIR24-18.901
150FC1-PINDIGHEB LINE24-10.1
151MEYAL V/A - END POINT SMS PINDIGHEB24-12.5
152KHUSHAL GARH BRIDGE-DAKHNI END POINT V/A24-11.4
153POINT A V/A - SMS DHURNAL30.24-
154GALI JAGIR - MORGAH (1)1021.43696-
155GALI JAGIR - MORGAH (2)69.50-
156GALI-RANIAL16-35.57
157WAH - ISLAMABAD612.06-
158WAH - HATTAR16-6.17
159WAH - HATTAR109.93-
160ADHI - RAWAT1047.70-
161ADHI-SUKHO10-11.50
162RAWAT - MURREE1257.25-
163BHANGALI LINE85.82-
164MISSA KASWAL - MANDRA820.60-
165WAH - NOWSHERA (1)1050.41-
166WAH - NOWSHERA (2)16-52.60
167INDUS CROSSING24-1.12
168TAXILA LINE44.43-
169SANJWAL LINE66.67-
170KOHAT LINE811.58-
171SHAKARDARA - DAUDKHEL1040.11-
172DAUDKHEL-MIANWALI1050.70-
173MPCL (KALABAGH-1) - MID POINT V/A, MP 11.29 ON SHAKARDARA DAUDKHEL PIPELINE81.00-
174SHAKARDARA END POINT - F3101.55-
175SADQAL - NAUGAZI LINE1619.02-
176DASKA - PASROOR LINE824.86-
177DASKA-SAMBRIAL LINE811.6-
178FAUJI KABIR WALA LINE85.86-
179OKARA - DIPALPUR LINE816.83-
180ROUSCH POWER PLANT LINE164.70-
181PINDORI - BHANGALI LINE815.83-
182CV24-PINDORI (FIRST SEGMENT)1026.33-
183KM 26.33 - KM 30.80 (CV24- PINDORI PIPELINE)104.47-
184MIANWALI LINE817.8-
185DI-KHAN BHAKAR LINE819.69-
186MIAN CHUNNUN - HASILPUR1283.85-
187HASILPUR - CHISHTIAN LINE830.98-
188AV-40 - DIJKOT - TANDLIANWALA839.79-
189AV-40 - BHAWANA LINE837.14-
190SUKHO - RAWAT1636.24-
191DIPALPUR - BASIRPUR822.64-
192MANGA - PACKAGES LINE( RENTED POWER )836.65-
193RODHO - KOT QAISRANI LINE1214.5-
194SAHIWAL -PHOOLNAGAR LOOP LINE FROM AKHTARABAD V/A to N-6 Pattoki V/A24-20.95
195N-6 - PHOOL NAGAR O/T24-21.69
196SHAHPUR-HUSSAIN SHAH LINE822.22-
197HUSSAIN SHAH-SAHIWAL TOWN LINE813.52-
198SAHIWAL TOWN-SILLANWALI LINE826.71-
199RANDHAWA OFF-TAKE TO BADIANA88.50-
200KOTLI RAI ABU BAKAR LINE87.05-
SUB TOTAL PUNJAB3295.433709.69
Sr #. Section Dia Meter in Inches MainLine (KM) LoopLine (KM)
1HATTAR-HARIPUR1018.12-
2HATTAR OFFTAKE60.39-
3HARIPUR-MANSEHRA870.53-
4HARIPUR OFFTAKE81.53-
5WAH-NOWSHERA(1)1025.13-
6WAH-NOWSHERA(2)16-23.68
7WAH - HATTAR16-13.62
8HATTAR - SARAI SALEH16-19
9HATTAR - HAVELLIAN16-15
10HAVILLINA - ABBATABAD16-27.5
11C10 - ISMAILKOT16-14.64
12KOHAT LINE819.20-
13KOHAT - NOWSHERA 2485.52-
14MATANI - REGI LALMA832.50-
15KOHAT-DAKHNI24-43.32
16DHOKE HUSSAIN GAS FIELD-DHODA/KOHAT814.5-
17EPF TOLANJ - GHORAZAI VALVE ASSEMBLY83.5-
18MANZALAI - KOHAT LINE2439.01-
19JARMA - HANGO LINE836.00-
20MUNJOWAL - BANNU836.50-
21NOWSHERA-ISMAILKOT(1)811.97-
22NOWSHERA-ISMAILKOT(2)6-11.97
23ISMAILKOT-TURNAB(1)8-20.85
24ISMAILKOT-TURNAB(2)620.86-
25ISMAILKOT-TURNAB(3)16-21.24
26SHAKARDARA - DAUDKHEL103.00-
27KHARAPPA - SHAKARDARA825.50-
28KHARAPPA - MANJOWAL1284.42-
29NARI PANOOS LINE82.98-
30MAKORI-KHARAPPA*108.75-
31MUNJOWAL - PEZU853.29-
32PEZU - D. I. Khan847.02-
33PEZU - TANK831.51-
34DI- KHAN BHAKAR818.8-
35NOWSHERA-MDN-T.BAI-S/KOT857.99-
36NOWSHERA-CHARSADDA823.59-
37NOWSHERA - MARDAN12-19.76
38MARDAN - SWAT12-104.89
39NOWSHERA - MARDAN16-2.16
40CHARSADDA-TURANG ZAI LINE610.36-
41TANGI LINE613.87-
42CHARSADHA - KHAZANA LINE822.64-
43CHARSADHA - KHAZANA - DOLATPURA60.34-
44JAHANGIRA - SWABI - TOPI 840.29-
45JAHANGIRA - SWABI - TOPI 8-38.24
46JAHANGIRA OFF-TAKE - KABUL X-ING D/S16-2.52
47KABUL X-ING JAHANGIRA 160.30-
48SAKHAKOT - SWAT868.06-
49CHAKDARA-TALASH LINE831.60-
50GURGURI - KOHAAT LINE1078-
SUB TOTAL KPK1037.56378.39
 
AZAD KASHMIR
1 SARAI ALAMGIR - MIRPUR 8 17.35 -
SUB TOTAL AZAD KASHMIR17.35-
GRAND TOTAL (KM)   = 9123.75
* Purchased by the Company from M/s M.O.L