LOCATION AND DIA WISE LENGTH OF TRANSMISSION LINES AS ON 31.01.2019

Sr # Section DIA Main Line Loop Line
(Inches) (Kilometers) (Kilometers)
1 PIRKOH - SUI 24 70.50 -
2 LOTI - PESHBOGI 18 11.25 -
3 SUI - MULTAN 24 19.31 -
4 SUI - MULTAN 30 - 19.31
5 SUI-MULTAN 24 14.29 -
6 SUI-MULTAN 30 - 14.29
7 SUI-MULTAN 16 0.26 -
8 GUDDU TPS 4 2.41 -
9 GUDDU BARRAGE 24 1.81 -
10 GUDDU CROSSING 36 - 1.81
11 SAWAN - QADIRPUR 24 131.00 -
12 SAWAN CUSTODY TRANSFER POINT-SV1 24 2.85 -
13 SAWAN CUSTODY TRANSFER POINT-U/S OF SV1 42 - 2.73
14 SV1-SV2 LINE 42 - 25.12
15 SV2-SV4 SEGMENT 42 - 55.33
16 SV4-SV5 42 - 20.92
17 SV5-QV1 SEGMENT 42 - 29.40
18 KAND KOT LINE 16 52.23 -
19 QADIRPUR LINE 30 53.13 -
20 QADIRPUR LINE 36 - 53.14
21 QADIRPUR LINE (LNG PHASE-II) 42 - 53.14
22 ENGRO FERTILIZER LINE 20 37.80 -
23 ENGRO ENERGY LINE 16 3.30 -
24 MARI DCPF - GENCO-II DEHYDRATION UNITS LINE 12 4.50 -
25 MARI DCPF - GENCO-II DEHYDRATION UNITS LINE 10 5.50 -
26 SUI - MULTAN 18 - 256.82
27 SUI - MULTAN 24 288.06 -
28 SUI - MULTAN 30 - 313.78
29 SUI - MULTAN 36 - 213.68
30 SUI - MULTAN 16 1.85 -
31 K1 - MP-37.88 20 - 20.68
32 SHER SHAH X-ING 36 - 2.20
33 AC1X - AV7 (RYK) 36 - 26.96
34 AC1X - AC2 (RLNG LINE) 36 - 44.62
35 AC2- AV9 (RLNG LINE) 36 - 18.52
36 AV9 - AV10 (RLNG LINE) 36 - 20.78
37 AV10 - A4 (RLNG LINE) 36 - 30.1
38 A4 - AC4 (RLNG LINE) 36 - 29.51
39 AC4 - AV15 (RLNG LINE) 36 - 25.348
40 AV15 - AV20 (RLNG LINE) 36 - 5.74
41 AV20 - AV21 (RLNG LINE) 36 - 38.09
42 AV21 - AV22 (RLNG LINE) 36 - 27.79
43 AV22 - AC6 (RLNG LINE) 36 - 27.35
44 AC6 - AV29 (RLNG LINE) 36 - 23.16
45 AV29 - N2 (RLNG LINE) 24 - 68.16
46 N2 - SAHIWAL (RLNG LINE) 24 - 77.296
47 SAHIWAL - OKARA CANTT. (RLNG LINE) 30 - 24.250
48 OKARA CANTT. - AKHTARABAD (RLNG LINE) 30 - 42.450
49 AKHTARABAD - PHOOLNAGAR (RLNG LINE) 30 - 42.64
50 AV17 - AV 20 36 - 3.50
51 AV21 - AV 22 36 - 27.79
52 SUTLEJ CROSSING - 1 12 1.61 3.22
53 SUTLEJ CROSSING - 2 36 - 2.04
54 KHANPUR LINE 6 22.81 -
55 A5 - BAHAWALPUR 8 48.18 -
56 AV22 - KOT ADDU 16 69.65 -
57 AV22 - KOT ADDU 20 - 38.01
58 MP 37.33 V/A CMS KAPCO 16 - 8.70
59 KOT ADDU - CHOWK SARWAR SHAHEED 8 26 -
60 D. G. KHAN LINE 8 72.06 -
61 DHODAK - KOT ADDU 16 77.79 -
62 TPS MUZAFFARGARH LINE 16 4.57 -
63 QADIRPUR - AC-1X LINE 30 17.11 -
64 QADIRPUR - AC-1X LINE 36 - 16.88
65 QADIRPUR - AC-1X LINE (LNG PHASE-II) 42 - 17.13
66 AHMEDPUR EAST 6 18.34 -
67 KHAN GARH 8 22.20 -
68 MULTAN - FERTILIZER LINE 10 1.430 -
69 JAHANIAN LINE 8 30.49 -
70 MULTAN - SIDHNAI 18 - 46.7
71 MULTAN - SIDHNAI 24 22.46 22.46
72 MULTAN - SIDHNAI 30 - 46.70
73 MULTAN - SIDHNAI 36 - 48.38
74 AV29 - SAHIWAL 36 - 145.46
75 KASHMORE-SHAHWALI LINE 12 20 -
76 SHAHWALI - ROJHAN LINE (FIRST SEGMENT) 12 4.0 -
77 SHAHWALI - ROJHAN LINE (MP 14.92 TO MP 27.792) 12 21.0 -
78 HAROONABAD LINE 8 20 -
79 SMS KHANGARH - KALLARWALI 8 30 -
80 SMS KALLARWALI - CHOWK PERMIT 8 27.61 -
81 SIDHNAI - FAISALABAD 18 - 163.58
82 SIDHNAI - FAISALABAD 24 - 50.24
83 SIDHNAI - FAISALABAD 30 - 53.29
84 SIDHNAI - FAISALABAD 36 - 26.42
85 SIDHNAI X-ING - AC-7 36 - 33.26
86 AC7 - HAVELI BAHADUR SHAH 30 37.30 -
87 DARKHANA-SINDHELIANWALI LINE 8 17.40 -
88 T.T. SING - JHANG 8 30.28 -
89 DIJKOT-SAMUNDARY LINE 8 22.33 -
90 SAHIWAL - LAHORE 18 142.93 -
91 SAHIWAL - AKHTARABAD 24 - 66.69
92 SUNDER INDUSTRIAL STATE LINE 16 4.34 -
93 AC8 - SMSII (OLD) 16 - 5.90
94 AC8 - A11 20 - 0.66
95 WAPDA OFFTAKE FSD 12 2.42 -
96 CHAK JHUMRA LINE 6 12.04 -
97 FSD - MALIKWAL 12 19.34 -
98 FSD - MALIKWAL 16 - 158.67
99 FSD - MALIKWAL 30 - 90.82
100 CV12A - KHATHIALA SHAKHAN LINE 12 28.23 -
101 KATHIALA SHEIKHAN - MANDI BAHAUDDIN LINE 12 9.1 -
102 MANDI BAHAUDDIN - LALAMUSA LINE 12 47.17 -
103 MALAKWAL - JHELUM CROSSING 16 - 5.42
104 CHENAB CROSSING CHINIOT 18 1.13 -
105 CHENAB CROSSING CHINIOT 30 2.32 -
106 KOT MOMIN - JOHARABAD (1) 8 72.41 -
107 KOT MOMIN - JOHARABAD (2) 6 38.36 -
108 JOHARABAD - CHASHMA 8 82.21 -
109 PIPLAN LINE 8 17.05 -
110 SARGODHA LINE 6 20.92 -
111 SARGODHA LINE 16 - 20.92
112 CV3 (JHOKE MORE)-M3 INDUSTRIAL ESTATE LINE 8 15.68 -
113 FSD - SHAHDARA 16 57.48 119.25
114 NEW BV3 - MP 28.33 (RLNG LINE) 16 - 25.10
115 FSD - SHAHDARA 24 - 55.03
116 BC1 - FAROOQ ABAD 8 22.96 -
117 SHAHDARA - LAHORE 16 2.51 2.99
118 RAVI CROSSING (1) 16 0.58 -
119 RAVI CROSSING (2) 10 - 0.58
120 SHAHDARA - WAPDA LAHORE 10 3.41 -
121 KHURRIANWALA - JARANWALA 8 - 22.53
122 DAWOOD HERCULES LINE 12 5.87 -
123 SHEIKHUPURA - GUJRANWALA (1) 10 59.44 -
124 SHEIKHUPURA - GUJRANWALA (2) 16 - 44.57
125 MP 59.91 - B3 LINE 24 - 22.83
126 MP 59.91 - TATLAYALI V/A (RLNG LINE) 16 - 44.57
127 MP 59.91 - BHIKHI POWER PLANT (QATPL) 30 - 16.17
128 B2 - MP 50.70 (QATPL LINE) 30 - 1.45
129 MP 59.91 - NANDIPUR POWER PLANT 24 76.40 -
130 TATLAYALI V/A - MP 27.186 ON NANDIPUR POWER PLANT PIPELINE 24 8.20 -
131 B3-RAVI D/S LINE 24 - 3.15
132 KOTLI - RAHWALI (BV13) 18 30.76 -
133 HAFIZABAD LINE 8 43.00 -
134 SHAHDARA - GUJRANWALA - RAHWALI 10 73.4 -
135 RAHWALI - GUJRAT 8 35.46 -
136 RAHWALI - SIALKOT 8 13.97 13.97
137 SIALKOT OFF-TAKE V/A TO PASROOR OFF-TAKE V/A 16 - 32.83
138 RAHWALI-SIALKOT OFFTAKE 18 - 1.48
139 PASROOR - DHAMTAL - NAROWAL  8 40.55 -
140 SIALKOT O/T - WAZIRABAD 18 - 19.82
141 SAHIWAL - LAHORE 16 - 76.67
142 BSL U/S - BALLOKI POWER PLANT 30 7.5 -
143 PHOOL NAGAR - U/S HEAD BALLOKI 18 - 10.38
144 D/S HEAD BALLOKI TO MP-59.9 18 - 52.34
145 PHOOL NAGAR - DAWOOD HERCULES 16 62.38 -
146 PHOOLNAGAR - DAWOOD HERCULES 24 - 65.47
147 U/S V/A HEAD BALLOKI TO D/S V/A HEAD BALLOKI (RLNG LINE) 24 - 3.10
148 ORIENT POWER PLANT LINE 10 1.88 -
149 SAPPHIRE POWER PLANT LINE 10 0.22 -
150 HALMORE POWER LINE 12 3.40 -
151 SAIF POWER PLANT SAHIWAL 12 0.34 -
152 GUJRAT - JHELUM 8 54.27 -
153 SARAI ALAMGIR - MIRPUR 8 18.5 -
154 RENALA-SATGARAH 8 12.35 -
155 MALIKWAL - HARANPUR - DANDOT 12 1.18 -
156 MALIKWAL - HARANPUR - DANDOT 16 - 20.00
157 CC1 - C4 30 - 29.09
158 C4 - CHAKWAL CEMENT 10 24.00 -
159 HARANPUR - GHARIBWAL 8 13.02 -
160 DANDOT - GALI JAGIR - WAH 10 87.7 -
161 DANDOT - GALI JAGIR - WAH 16 - 153.51
162 DANDOT - GALI JAGIR - WAH 30 - 64.22
163 DAKHNI - MEYAL - DHULIAN 16 50.44 -
164 CV13a - CC1 16 - 3.58
165 RATANA LINE 10 2.49 -
166 SIL CROSSING 10 - 1.46
167 DHURNAL LINE (1) 8 0.54 -
168 DHURNAL LINE (2) 10 11.08 -
169 DHULIAN - DAUDKHEL 8 85.2 4.04
170 FC1 - MP 13.20 24 - 21.25
171 FC1-C6 PIPELINE FROM MID POINT VALVE ASSEBMLY TO END POINT C6 GALI JAGIR 24 - 18.901
172 FC1-PINDIGHEB LINE 24 - 10.1
173 MEYAL V/A - END POINT SMS PINDIGHEB 24 - 12.5
174 KHUSHAL GARH BRIDGE-DAKHNI END POINT V/A 24 - 11.4
175 POINT A V/A - SMS DHURNAL 3 0.24 -
176 GALI JAGIR - MORGAH (1) 10 21.43696 -
177 GALI JAGIR - MORGAH (2) 6 9.50 -
178 GALI-RANIAL 16 - 35.57
179 WAH - ISLAMABAD 6 12.06 -
180 WAH - HATTAR 16 - 6.17
181 WAH - HATTAR 10 9.93 -
182 ADHI - RAWAT 10 47.70 -
183 RAWAT - MURREE 12 57.25 -
184 BHANGALI LINE 8 5.82 -
185 MISSA KASWAL - MANDRA 8 20.60 -
186 WAH - NOWSHERA (1) 10 50.41 -
187 WAH - NOWSHERA (2) 16 - 52.60
188 INDUS CROSSING 24 - 1.12
189 TAXILA LINE 4 4.43 -
190 SANJWAL LINE 6 6.67 -
191 KOHAT LINE 8 11.58 -
192 SHAKARDARA - DAUDKHEL 10 40.11 -
193 MPCL (KALABAGH-1) - MID POINT V/A, MP 11.29 ON SHAKARDARA DAUDKHEL PIPELINE 8 1.00 -
194 SHAKARDARA END POINT - F3 10 1.55 -
195 SADQAL - NAUGAZI LINE 16 19.02 -
196 DASKA - PASROOR LINE 8 24.86 -
197 DASKA-SAMBRIAL LINE 8 11.6 -
198 FAUJI KABIR WALA LINE 8 5.86 -
199 OKARA - DIPALPUR LINE 8 16.83 -
200 ROUSCH POWER PLANT LINE 16 4.70 -
201 PINDORI - BHANGALI LINE 8 15.83 -
202 CV24-PINDORI(FIRST SEGMENT) 10 26.33 -
203 KM 26.33 - KM 30.80 (CV24-PINDORI PIPELINE) 10 4.47 -
204 MIANWALI LINE 8 17.80 -
205 DI-KHAN BHAKAR LINE 8 19.69 -
206 MIAN CHUNNUN - HASILPUR 12 83.85 -
207 HASILPUR - CHISHTIAN  LINE 8 30.98 -
208 AV-40 - DIJKOT - TANDLIANWALA 8 39.79 -
209 AV-40  - BHAWANA LINE 8 37.14 -
210 SUKHO - RAWAT 16 36.24 -
211 DIPALPUR - BASIRPUR 8 22.64 -
212 MANGA - PACKAGES LINE( RENTED POWER ) 8 36.65 -
213 RODHO - KOT QAISRANI LINE 12 14.50 -
214 SAHIWAL -PHOOLNAGAR LOOP LINE FROM AKHTARABAD  V/A to N-6 Pattoki V/A 24 - 20.95
215 N-6 - PHOOL NAGAR O/T 24 - 21.69
216 SHAHPUR-HUSSAIN SHAH LINE 8 22.22 -
217 HUSSAIN SHAH-SAHIWAL TOWN LINE 8 13.52 -
218 SAHIWAL TOWN-SILLANWALI LINE 8 26.71 -
219 RANDHAWA OFF-TAKE TO BADIANA 8 8.50 -
220 KOTLI RAI ABU BAKAR LINE 8 7.05 -
221 HATTAR-HARIPUR 10 18.12 -
222 HATTAR OFFTAKE 6 0.39 -
223 HARIPUR-MANSEHRA 8 70.53 -
224 HARIPUR OFFTAKE 8 1.53 -
225 WAH-NOWSHERA(1) 10 25.13 -
226 WAH-NOWSHERA(2) 16 - 23.68
227 WAH - HATTAR 16 - 13.62
228 HATTAR - SARAI SALEH 16 - 19
229 HATTAR - HAVELLIAN 16 - 15.00
230 HAVILLINA - ABBOTTABAD 16 - 27.5
231 C10 - ISMAILKOT 16 - 14.64
232 KOHAT LINE 8 19.20 -
233 KOHAT - NOWSHERA  24 85.52 -
234 MATANI - REGI LALMA; 8 32.50 -
235 KOHAT - GHORAZAI LINE 24 - 23.49
236 EPF TOLANJ - GHORAZAI VALVE ASSEMBLY 8 3.50 -
237 MANZALAI - KOHAT LINE 24 39.01 -
238 JARMA - HANGO LINE 8 36.00 -
239 MUNJOWAL - BANNU 8 36.50 -
240 NOWSHERA-ISMAILKOT(1) 8 11.97 -
241 NOWSHERA-ISMAILKOT(2) 6 - 11.97
242 ISMAILKOT-TURNAB(1) 8 - 20.85
243 ISMAILKOT-TURNAB(2) 6 20.86 -
244 ISMAILKOT-TURNAB(3) 16 - 21.24
245 SHAKARDARA - DAUDKHEL 10 3.00 -
246 KHARAPPA - SHAKARDARA 8 25.50 -
247 KHARAPPA - MANJOWAL 12 84.42 -
248 NARI PANOOS LINE 8 2.98 -
249 MAKORI - KHARAPPA * 10 8.75 -
250 MUNJOWAL - PEZU 8 53.29 -
251 PEZU - D. I. Khan 8 47.02 -
252 PEZU - TANK 8 31.51 -
253 DI- KHAN BHAKAR 8 18.80 -
254 NOWSHERA-MDN-T.BAI-S/KOT 8 57.99 -
255 NOWSHERA-CHARSADDA 8 23.59 -
256 NOWSHERA - MARDAN 12 - 19.76
257 MARDAN - PALAI 12 - 56.00
258 THANA - SWAT 12 - 31.27
259 NOWSHERA - MARDAN 16 - 2.16
260 CHARSADDA-TURANG ZAI LINE 6 10.36 -
261 TANGI LINE 6 13.87 -
262 CHARSADHA - KHAZANA LINE 8 22.64 -
263 CHARSADHA - KHAZANA - DOLATPURA 6 0.34 -
264 JAHANGIRA - SWABI - TOPI  8 40.29 -
265 JAHANGIRA - SWABI - TOPI  8 - 38.24
266 JAHANGIRA OFF-TAKE - KABUL X-ING D/S 16 - 2.52
267 KABUL X-ING JAHANGIRA  16 0.30 -
268 SAKHAKOT - SWAT 8 68.06 -
269 CHAKDARA-TALASH LINE 8 31.60 -
270 GURGURI - KOHAT LINE 10 78.00 -
271 SARAI ALAMGIR - MIRPUR 8 17.35 -
GRAND TOTAL (KM) = 8899.60